Clinton River Oaks Engagement Map
Phases
Phases overview
Phase 1: Map Feedback
Map Feedback
Map Feedback
January 14, 2026 5:00 AM - May 5, 2026 4:00 AM
Place a pin on the map below to share a memory, a special place in the park or leave a comment telling us what you would like to see in the future Clinton River Oaks.
Ideas added on paper during our open house event have been uploaded by the Co-Creation Lab account.
If the map does not load, try switching to the "List" view then back to the "Map" view.
40 ideas
Unable to display map. WebGL2 support is required.
Ensure that your browser and hardware meet the minimum requirements.
https://esriurl.com/webgl-faqMaintain and expand single track (MTB & hike)
, 6 comments
Pump track and skills park
, 8 comments
Improve connectivity and downtown access
Trail camping?
River Walk to downtown Rochester
Maintain access through CiderMill Village
MTB Trails North of Clinton River
Trash/glass remediation
Nature Overlook - Treehouse
Revive the shelter.
Cap the well
Paint Creek Trail Southern Extension
, 1 comment
More connections to Clinton River Trail
Add bus loop
Adaptive BMT (CAMTB) and Flow Trail (multi-use)
Swale stormwater infrastructure
Replace bridge
Park Entrance and/or trailhead location?
, 1 comment
More kayak access all along route
, 2 comments
access to trails through Cider Mill Village from Avon to Yates
, 1 comment
